Product Center

Dining Furniture MDF+glass with glaze Extension dining table TD-2050

Short Description:

Dining Furniture MDF+glass with glaze Extension dining table TD-2050


  • MOQ: Chair 100PCS, Table 50PCS, Coffee table 50PCS
  • Delivery Port: Tianjin Port/Shenzhen Port/Shanghai Port
  • Production Time: 35-50 Days
  • Payment Term: T/T Or L/C
  • Product Detail

    Product Tags

    TXJ - Company Profile

    Business Type: Manufacturer/Factory & Trading Company
    Main Products: Dining table, Dining chair, Coffee table, Relax chair, Bench
    Number of Employees: 202
    Year of Establishment: 1997
    Quality Related Certification: ISO, BSCI, EN12521(EN12520), EUTR
    Location: Hebei, China (Mainland)

    ad1ea2824b3a553d1e86d76243049c8

    Product Specification

                         Extension Dining Table

    Size:  L1600-2000 W900mm   H760mm

    Top: MDF+glass with glaze

    Frame: MDF+stainless brush

    Base: stainless with brush

    Package: 1PC/3CTNS

    Volume: 0.423CBM/PC

    Loadability: 156PCS/40HQ

    MOQ: 50PCS

    Delivery port: FOB Tianjin

    https://www.sinotxj.com/td-2050.html
    Production Process

    MDF Production

     11

    Color Swatch

    Color-Swatch

    Packing & Loading

    Packing

    All the products of TXJ must be packed well enough to make sure the products delivered safely to the customers.

    (1) Assembly instructions (AI) Requirement: AI will be packaged with a red plastic bag and be sticked at a fixed place where is easy to be seen on the product. And it will be sticked to every piece of our products.

    (2) Fitting bags:Fittings will be packaged by 0.04mm and above red plastic bag with “PE-4” printed to ensure the safety. Also, it should be fixed at easy found place.

    (3) Chair Seat&Back Package Requirements:All the upholstery must be packaged with coated bag, and load-bearing parts be foam or paperboard.It should be separated with metals by packing materials and the protection of metals’ parts which are easy to harm upholstery should be strengthened.

    (4) Packed well goods:

    (5) Loading container process:During loading,we will take record about the actual loading quantity and take loading pictures as reference for customers.

    1

    Payment & Delivery

    Payment Method: Advance TT, T/T, L/C
    Delivery Details: within 45-55days after confirming the order

    9

    Main Export Markets

    Europe /Middle East/Asia /South America/Australia/Middle America etc.

    market-11

    Primary Competitive Advantage

    Customized production/EUTR available/Form A available/Prompt delivery/Best after-sale service


  • Previous:
  • Next:

  • Write your message here and send it to us